Lower Alloways Creek Elementary School

Project Info

  • Construction Date

    August 2017

  • Category

    Education

System Requirements

The new sound system for the Lower Alloways Creek Elementary School had to provide high-quality music reinforcement for daily gym classes, as well as clear and even coverage for speech during presentations and performances.


System Design

Our sound system design was based around a left/right column design which provides even coverage and works for both music during gym classes and for performances.

Featured Equipment
  • JBL CBT column loudspeakers with low-frequency extensions
  • JBL dual 10″ subwoofers
  • QSC TouchMix digital mixer with wireless iPad control
  • Furman power conditioner/sequencer

Result

The new sound system has been a welcomed addition for the staff, students, and parents.  The physical education department no longer has to wheel out a portable sound system and for musical and dramatic performances, parents can hear clearly in the front and back rows.  With the wireless iPad control of the mixer, the system is easily controllable anywhere in the room without wires.